Proper site preparation ensures your building is level, doors operate smoothly, and the 50-year warranty remains valid.
Our installers will temporarily block and level your building using concrete patio blocks. However, the installation site must be no more than 12 inches out of level across the length or width of the building footprint.
If the site is more than 12 inches out of level, the delivery team cannot safely install the building without structural risk. In these cases, you must prepare a leveled dirt or gravel pad prior to delivery.
While not strictly required, a crushed limestone gravel pad with a 4x4 timber perimeter is the absolutely best foundation you can provide to ensure decades of stability. Contact us for local contractor recommendations.